| Path to a man-made island on the Pearl... |
Showing posts with label Architecture. Show all posts
Showing posts with label Architecture. Show all posts
Monday, September 3, 2018
Thursday, November 2, 2017
Monday, October 2, 2017
The Salt Tower...
The Salt Tower
3D printed plaster, clay, salt, paint; base made of CNC milled marble.
It's estimated that 99% of potable water in Qatar is desalinated sea water, a process that requires 5 litres of oil per each cubic meter of treated water. Most desalination plants are located along the country's west coast, resulting in the adjacent sea being approximately 30% more saline than the country's east coast.
The design of the Salt Tower was catalyzed by the aforementioned. Placed by Qatar's west coast, the design is surrounded by a salt farm, which provides the raw material - the bricks - that make up the bulk of the Salt Tower's walls. Here, however, the tectonic support is, in a sense, 'reversed', and is actually provided by the gridded 'mortar' that surrounds the hollows that support the salt bricks. Maintaining this wall of salt would require constant upkeep. The salt farm provides the material, human labour would be needed to both fabricate the bricks and to patch the cavities resulting from seasonal rains and general erosion. The tower would act as a constant quantified reminder of the energy and effort required to provide us with one of our most basic needs.
| Sketch of the Salt Tower... |
Wednesday, September 6, 2017
Tuesday, August 22, 2017
Tuesday, July 4, 2017
The Weathered Tower...
The Weathered Tower
Made of 3D printed white ABS; green, blue and black paint; base of CNC milled travertine and mastic.
It's been estimated that the average age of a building in the Gulf region is 5 years, and the average lifespan of a building is 20 years.
The
design acknowledges the need for select nodes of seeming permanence in a
perpetually changing world. The tower, which stands on an unspecified
rock in an undetermined desert within the GCC, would act as a 'filter'
of the subtly abrasive but unrelenting dust and sand present at the
setting, which would permeate and transcend through its ribbed torso, a
slow and extended performance that would gradually begin to weather and
wear off the tower's various stratum of paint, layer by layer, revealing
the green below the black, blue below the green, and the white core
below the blue. This process would take years, decades, to complete. The
layers would reveal themselves unevenly, dependent on the whims of the
prevalent winds and its changing environs. In time the tower would
reflect - celebrate - its age, and in its ever morphing/ amended
presence, become a connective link between generations...
Sunday, April 2, 2017
Sunday, March 19, 2017
Architects Independent Presentation at the Doha Fire Station...
Join us on Monday, March 27 at 6.30 pm at the Doha Fire-Station for our presentation titled:
Intrepid Architects Independent
Ardent Explorations of 3D Printing, Design, Architecture & Beyond...
Portrait by Markus Elblaus
Saturday, February 20, 2016
Tuesday, January 5, 2016
Tuesday, December 15, 2015
Monday, November 23, 2015
Subscribe to:
Posts (Atom)













